![]() ![]() “One way that the ‘peak’ water usage rate from DWSD can be controlled is by the installation of a water storage facility.” “Commerce Township currently pays one of the highest rates of any Detroit Water and Sewerage customer,” Jason Mayer, Township engineer with Giffels Webster, said during a meeting in 2013. The water storage facility has an anticipated savings of $1.3 million per year, which would offer payback in less than five years. Officials proposed the project has a way to offset the wholesale water rate cost from the Detroit Water and Sewerage Department (DWSD) by reducing peak usage from DWSD supply points.Īccording to documents from the Township, Commerce currently pays one of the highest rates of any DWSD customer. Plans to construct the water storage facility have been discussed since 2012. The project will be paid for by the water system capital improvement fund. Sorenson Gross submitted the second lowest bid at $5,370,209. A total of five bids were received ranging from $5,345,400 to $6,240,000, with the lowest bid submitted by RCL Construction of Stanford, MI. 1 during their meeting on Tuesday, May 12.īids for the project were received on April 2. WRAP’s mission is to administer the distribution of WRAP funding to the eligible, low-income customers of the GLWA, with a vision to create a transformative water utility assistance program focusing on bill assistance, conservation, and self-sufficiency initiatives.The Commerce Township Board of Trustees unanimously approved a $5.3 million contract with RCL Construction for the construction of a 2-million gallon water storage tank near Commerce Township Fire Station No. At or below 200% of the federal poverty level.Reside within an eligible GLWA Member Community (see list below).WRAP Participant Eligibility Requirements ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |